500th load goes through our new Timber Treatment Centre


Less than 6 months since it became fully operational, this is the 500th load of timber being sent into our new fully automated Timber Treatment Centre, one of the most advanced of its kind in the UK.

Built at a cost of £2.75 million, the new facility has dramatically increased the efficiency of our treatment operation and greatly improved our flexibility in this part of the business. Other significant benefits include a greatly enhanced environmental profile and better working conditions for those involved in that area.

You can get a better idea of how the Centre works here although we hope to post some video of the operation before too long.